
Our operations
Our Pilbara mines, rail network and port infrastructure are among the most efficient on Earth. See how we run it.
Most mining companies dig things up and ship them out. We do that too.
But we’re using the scale, the capital and the operating environment of one of the world’s largest iron ore businesses to do something no one else has done. Cut fossil fuels out of heavy industry, in real operations, at real scale, profitably.
Nearly 200 million tonnes of iron ore move through our Pilbara operations every year, connected by 760 kilometres of rail, and shipped to customers across the globe.
That scale is our lever. It powers the capital, the infrastructure and the real-world operating environment to test what actually works, under real heat, real dust, and real production pressure.
This is where Real Zero gets real.

Our Pilbara mines, rail network and port infrastructure are among the most efficient on Earth. See how we run it.
Autonomous trucks. Real-time data. AI-driven decisions. The HIVE runs our operations from pit to port, 24/7. This is mining re-engineered for the future.
Port Hedland is the gateway for our iron ore, and one of the busiest bulk export ports on the planet. Every tonne we produce passes through here on its way to steel mills across Asia and beyond.

We’re building the world’s first fully integrated industrial green grid. A renewable energy system designed to power our entire Pilbara operation, around the clock. No offsets. No shortcuts. Real infrastructure, scaling now.
Solar, wind, battery storage and 620km of transmission working as one connected system. By 2028 we’ll have 1.5GW solar, 900MW wind and 5GWh of battery storage. Power generated, stored and moved across the Pilbara, where it’s needed, when it’s needed.
Electrifying our operations changes the skills needed to run them. We’re investing now, building electrical capability across our workforce through apprenticeships, traineeships, graduate programs and on-the-job training. At peak, we expect to create up to 1,800 new electrical roles, and we’re widening access for women, young Australians and First Nations people to fill them.
Renewable energy doesn’t run itself. We’re building AI-driven energy management, battery intelligence software and real-time decision tools that keep operations moving while fossil fuels come out.
Through Fortescue Zero, our R&D and commercialisation arm, we develop, test and deploy zero-emissions solutions that turn Real Zero from ambition into operation. We prove it on our own sites first, under real conditions, then we take it further.
Battery systems designed for the heat, dust and 24/7 demands of industrial operations, built to perform where standard solutions don’t last.

Elysia turns batteries from storage into connected decision-makers. Real-time safety alerts, charging optimisation and end-of-life forecasting across electric fleets and energy systems.

Electric drivetrains, fast charging and fleet management systems built for industrial scale. Already operating on our sites and ready to go further.
Advanced engineering and decarbonisation consulting for heavy industry, drawing on what we’ve already built and proved in the Pilbara to help others do the same.
We’re not stopping at iron ore, or the Pilbara. We’re identifying and developing opportunities in critical minerals, new markets and emerging technology that will define what Fortescue becomes next.
Heavy industry produces six billion tonnes of carbon emissions every year. The world has spent decades managing that number. We’re calling on governments, markets and industry to eliminate it.
Real Zero means no fossil fuels. No offsets. No accounting tricks. Emissions cut at the source, inside real operations, in real time. We’re proving it’s possible by doing it ourselves.
We’re eliminating fossil fuels from our iron ore operations, building renewable energy at scale and developing the technology heavy industry needs to decarbonise.
Big work. Real work. Happening now.
Join us.
19100
Australia
Australia - Perth
Corporate and Support Functions
Metals
19090
Australia
Australia - Port Hedland
Operations and Maintenance
Metals
19086
Australia
Australia - Christmas Creek
Operations and Maintenance
Metals
19063
Australia
Australia - Perth
Corporate and Support Functions
Corporate
19040
Australia
Australia - Solomon
Operations and Maintenance
Metals
19025
Australia
Australia - Christmas Creek
Operations and Maintenance
Metals
19023
Australia
Australia - Christmas Creek
Operations and Maintenance
Metals
19006
Australia
Australia - Perth
Corporate and Support Functions
Corporate
18991
Australia
Australia - Iron Bridge
Corporate and Support Functions
Metals
18989
Australia
Australia - Perth
Corporate and Support Functions
Energy
18987
Australia
Australia - Perth
Corporate and Support Functions
Metals
18976
Australia
Australia - Perth
Corporate and Support Functions
Metals
18969
Australia
Australia - Perth
Corporate and Support Functions
Energy
18957
Australia
Australia - Perth
Corporate and Support Functions
Corporate
18956
Australia
Australia - Perth
Corporate and Support Functions
Metals
18954
Australia
Australia - Perth
Operations and Maintenance
Metals
18953
Australia
Australia - Port Hedland
Engineering and Technical Roles
Metals
18938
Australia
Australia - Port Hedland
Operations and Maintenance
Metals
18932
Australia
Australia - Christmas Creek
Operations and Maintenance
Metals
18931
Australia
Australia - Iron Bridge
Operations and Maintenance
Metals
18927
Australia
Australia - Perth
Corporate and Support Functions
Corporate
18926
Australia
Australia - Perth
Corporate and Support Functions
Metals
18900
Australia
Australia - Perth
Corporate and Support Functions
Corporate
18895
Australia
Australia - Solomon
Operations and Maintenance
Metals
18886
Australia
Australia - Perth
Corporate and Support Functions
Metals
18885
Australia
Australia - Perth
Corporate and Support Functions
Corporate
18878
Australia
Australia - Christmas Creek
Operations and Maintenance
Metals
18867
Australia
Australia - Perth
Operations and Maintenance
Metals
18853
Australia
Australia - Solomon
Operations and Maintenance
Metals
18847
Australia
Australia - Cloudbreak
Corporate and Support Functions
Metals
18846
Australia
Australia - Cloudbreak
Operations and Maintenance
Metals
18842
Australia
Australia - Solomon
Operations and Maintenance
Metals
18841
Australia
Australia - Perth
Corporate and Support Functions
Corporate
18835
Australia
Australia - Perth
Operations and Maintenance
Metals
18831
Australia
Australia - Perth
Corporate and Support Functions
Metals
18829
Australia
Australia - Eliwana
Operations and Maintenance
Metals
18797
Australia
Australia - Perth
Corporate and Support Functions
Corporate
18787
Australia
Australia - Perth
Operations and Maintenance
Metals
18739
Australia
Australia - Perth
Corporate and Support Functions
Corporate
18729
Australia
Australia - Cloudbreak
Operations and Maintenance
Metals
18642
Australia
Australia - Perth
Engineering and Technical Roles
Corporate
18595
Australia
Australia - Iron Bridge
Engineering and Technical Roles
Metals
18554
Australia
Australia - Perth
Engineering and Technical Roles
Metals
18509
Australia
Australia - Cloudbreak
Operations and Maintenance
Metals
18333
Australia
Australia - Christmas Creek
Operations and Maintenance
Metals
18284
Australia
Australia - Solomon
Operations and Maintenance
Metals
18260
Australia
Australia - Perth
Engineering and Technical Roles
Metals
18188
Australia
Australia - Christmas Creek
Operations and Maintenance
Metals
17823
Australia
Australia - Solomon
Operations and Maintenance
Metals
17705
Australia
Australia - Solomon
Operations and Maintenance
Metals
12997
Australia
Australia - Cloudbreak
Operations and Maintenance
Metals
11063
Australia
Australia - Solomon
Operations and Maintenance
Metals
10737
Australia
Australia - Perth
Operations and Maintenance
Metals
10735
Australia
Australia - Perth
Operations and Maintenance
Metals
10730
Australia
Australia - Cloudbreak
Operations and Maintenance
Metals
10729
Australia
Australia - Cloudbreak
Operations and Maintenance
Metals