Eliwana was designed differently from day one.
Commissioned in 2020, its advanced low-profile plant can direct load up to 5,200 tonnes of ore per hour. Faster movement. Lower energy use. Long-term operational efficiency built into the system from the start.
Located in Nanutarra in Western Australia’s Pilbara region, on Puutu Kunti Kurrama and Pinikura Country, Eliwana is now helping lead the next shift in heavy industry.
Built for performance. Built for what comes next.
Eliwana is one of the first sites in our network being designed around renewable energy systems at scale.
Battery storage and transmission infrastructure are reshaping how heavy industry gets powered.
This isn’t theory. It’s energy infrastructure built to keep real operations moving.
We’re cutting fossil fuels out of iron ore operations. Scaling renewable energy infrastructure. Deploying the systems needed to decarbonise heavy industry.
And Eliwana is helping lead that shift.
If you want to work where new energy systems are being built at scale, this is the place.
Join us.
19405
Australia
Australia - Cloudbreak
Operations and Maintenance
Metals
19352
Australia
Australia - Solomon
Operations and Maintenance
Metals
19337
Australia
Australia - Solomon
Engineering and Technical Roles
Metals
19311
Australia
Australia - Iron Bridge
Operations and Maintenance
Energy
19296
Australia
Australia - Solomon
Operations and Maintenance
Metals
19289
Australia
Australia - Port Hedland
Engineering and Technical Roles
Metals
19265
Australia
Australia - Iron Bridge
Corporate and Support Functions
Metals
19149
Australia
Australia - Christmas Creek
Operations and Maintenance
Metals
19114
Australia
Australia - Cloudbreak
Operations and Maintenance
Metals
19090
Australia
Australia - Port Hedland
Operations and Maintenance
Metals
19086
Australia
Australia - Christmas Creek
Operations and Maintenance
Metals
19072
Australia
Australia - Port Hedland
Operations and Maintenance
Metals
19071
Australia
Australia - Solomon
Corporate and Support Functions
Corporate
19052
Australia
Australia - Iron Bridge
Engineering and Technical Roles
Metals
19051
Australia
Australia - Iron Bridge
Engineering and Technical Roles
Metals
19050
Australia
Australia - Christmas Creek
Operations and Maintenance
Metals
18595
Australia
Australia - Iron Bridge
Engineering and Technical Roles
Metals
Follow the projects, progress and breakthroughs driving Real Zero across our Pilbara operations.

10 November 2026

6 November 2026

3 November 2026
.jpg%3Fh%3D2001%26iar%3D0%26w%3D3000&w=3840&q=75)
27 October 2026

22 October 2026
.jpg%3Fh%3D735%26iar%3D0%26w%3D1100&w=3840&q=75)
19 October 2026
12 October 2026

23 September 2026

18 September 2026

31 August 2026