
10 November 2026


Cloudbreak was the site that changed everything.
From first ore production in 2005, it proved we could break into an industry others said was untouchable. No rail. No mine. We built it anyway.
Located in the Chichester Ranges of Western Australia’s Pilbara region, on Palyku and Nyiyaparli Country, Cloudbreak helped forge our path in iron ore. Now it’s helping drive our next chapter.
Today, the site is scaling renewable energy, deploying zero emissions electric excavators and helping prove heavy industry can operate without fossil fuels.
First we challenged the iron ore giants. Now we’re taking on fossil fuels.
Cloudbreak is helping shape the next phase of Fortescue's operations. Solar infrastructure is expanding at scale. Diesel-powered excavators are being replaced with zero emissions alternatives.
This isn’t about ticking climate boxes. It’s about building a faster, smarter and more competitive operation for the future.

Cloudbreak is home to the first airfield in Australia to operate with fully solar-powered airstrip lighting. Small system. Big signal of where the industry is heading.






We’re cutting fossil fuels out of iron ore operations. Scaling renewable energy. Deploying the technology needed to decarbonise heavy industry.
And some of the biggest changes are happening right here at Cloudbreak.
If you want to work where the future is being built, now’s the time.
Join us.
19405
Australia
Australia - Cloudbreak
Operations and Maintenance
Metals
19352
Australia
Australia - Solomon
Operations and Maintenance
Metals
19337
Australia
Australia - Solomon
Engineering and Technical Roles
Metals
19311
Australia
Australia - Iron Bridge
Operations and Maintenance
Energy
19296
Australia
Australia - Solomon
Operations and Maintenance
Metals
19289
Australia
Australia - Port Hedland
Engineering and Technical Roles
Metals
19265
Australia
Australia - Iron Bridge
Corporate and Support Functions
Metals
19149
Australia
Australia - Christmas Creek
Operations and Maintenance
Metals
19090
Australia
Australia - Port Hedland
Operations and Maintenance
Metals
19086
Australia
Australia - Christmas Creek
Operations and Maintenance
Metals
19072
Australia
Australia - Port Hedland
Operations and Maintenance
Metals
19071
Australia
Australia - Solomon
Corporate and Support Functions
Corporate
19052
Australia
Australia - Iron Bridge
Engineering and Technical Roles
Metals
19051
Australia
Australia - Iron Bridge
Engineering and Technical Roles
Metals
19050
Australia
Australia - Christmas Creek
Operations and Maintenance
Metals
18595
Australia
Australia - Iron Bridge
Engineering and Technical Roles
Metals
Follow the projects, progress and breakthroughs driving Real Zero across our Pilbara operations.

10 November 2026

6 November 2026

3 November 2026
.jpg%3Fh%3D2001%26iar%3D0%26w%3D3000&w=3840&q=75)
27 October 2026

22 October 2026
.jpg%3Fh%3D735%26iar%3D0%26w%3D1100&w=3840&q=75)
19 October 2026
12 October 2026

23 September 2026

18 September 2026

31 August 2026