Operational Site
Our magnetite mining operation, located 145km south of Port Hedland on Nyamal Land.
Location
Australia
Product
Magnetite
Capacity
5-9Mtpa
Status
Operational
Our Iron Bridge facility produces a high-grade wet concentrate product which is transported to Port Hedland through a 135-kilometre-long specialist slurry pipeline.
Operated as an unincorporated joint venture between FMG Magnetite Pty Ltd (69%) and Formosa Steel IB Pty (31%), Iron Bridge is leading the way in sustainable magnetite production.








The Iron Bridge site is facilitating Fortescue’s transition towards Real Zero, becoming the first magnetite deposit to operate using renewable energy by 2030.

North Star Junction Solar farm supplies renewable power to the Iron Bridge grid.

65% of Iron Bridge’s warehouse operations fleet is battery electric.

Non Processing Infrastructure team exclusively uses battery tooling.

16 October 2025

29 August 2025

1 July 2025

27 June 2025

3 February 2025

26 September 2024

15 August 2024

12 August 2024

13 May 2024

21 March 2024

Real Zero is our plan to eliminate our scope 1 and scope 2 emissions across our Australian iron ore operations, without voluntary carbon offsets. For the benefit of our planet, our shareholders, and future generations.

Our Metals business includes iron ore operations in the Pilbara and exploration projects across the globe, spanning sites from Australia to Latin America and Gabon.